翻訳と辞書
Words near each other
・ Jais
・ Jais Malsarani
・ Jais Nielsen
・ Jaisak
・ Jaisalmer
・ Jaisalmer Airport
・ Jaisalmer basin
・ Jaipur Development Authority
・ Jaipur district
・ Jaipur division
・ Jaipur Duronto Express
・ Jaipur Elevated Road
・ Jaipur Engineering College
・ Jaipur House
・ Jaipur Institute of Engineering & Technology
Jaipur International Airport
・ Jaipur Kamakhya Kavi Guru Express
・ Jaipur Kathak Kendra
・ Jaipur leg
・ Jaipur Literature Festival
・ Jaipur mandal
・ Jaipur Metro
・ Jaipur Municipal Corporation
・ Jaipur Mysore Superfast Express
・ Jaipur National University
・ Jaipur Pink Panthers
・ Jaipur railway station
・ Jaipur Ring Road
・ Jaipur Rugs
・ Jaipur Rural (Lok Sabha constituency)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Jaipur International Airport : ウィキペディア英語版
Jaipur International Airport


Jaipur International Airport is the primary airport serving Jaipur, the capital of the Indian state of Rajasthan. It is located in the southern suburb of Sanganer, from Jaipur.〔(【引用サイトリンク】title=Jaipur Airport )〕 The airport was granted the status of international airport on 29 December 2005. The civil apron can accommodate 14 aircraft the size of an Airbus A320 and the new terminal building can handle up to 1000 passengers at a time.
==Layout and infrastructure==
The new domestic terminal building at the airport was inaugurated on 1 July 2009. The new terminal has an area of with facilities such as central heating system, central air conditioning, inline x-ray baggage inspection system integrated with the departure conveyor system, inclined arrival baggage claim carousels, escalators, public address system, flight information display system, CCTV for surveillance, airport check-in counters with Common Use Terminal Equipment (CUTE), car parking, etc. The International Terminal building has peak hour passenger handling capacity of 500 passengers and annual handling capacity of 400,000. The entrance gate is made of sandstone and Dholpur stones along with Rajasthani paintings on the walls. Runway expansion work at the airport started in February 2014 and was completed by July 2015 at an estimated cost of Rs.98 crore. The expansion allows the airport to accommodate wide-body aircraft.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Jaipur International Airport」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.